Robinson Solar
Robinson Solar is a planned solar farm located in White Pine County, Nevada. It would have a capacity of 300 MW. It is expected to come online in December 2029.
- Status
- Planned
- Capacity
- 300 MW
- Location
- White Pine County, Nevada
- Developer
- On paid plans
- Expected online
- December 2029
- Balancing authority
- NEVP
Location
White Pine County, Nevada, outlined on the map
Planned solar farms near Robinson Solar
- Arida 2 Solar Farm700 MW. Clark County, Nevada
- Libra Solar700 MW. Lyon County, Nevada
- Mosey544 MW. Clark County, Nevada
- Silver Star Solar517 MW. Nye County, Nevada
- Water Rock Solar 2517 MW. Nye County, Nevada
- Rock Valley Energy Center509 MW. Nye County, Nevada
- Bristlecone461 MW. Nye County, Nevada
- Arida 3 Solar Farm450 MW. Clark County, Nevada
- Bonanza Peak Solar Farm441 MW. Clark/Nye County, Nevada
- Purple Sage Energy Center409 MW. Clark County, Nevada
- Rough Hat400 MW. Clark County, Nevada
- Sierra Solar Hybrid400 MW. Churchill County, Nevada