Columbia SW YD(ALTE) - South Fond Du Lac SW YD 345 KV T-Line
Columbia SW YD(ALTE) - South Fond Du Lac SW YD 345 KV T-Line is a planned solar farm located in Columbia County, Wisconsin. It would have a capacity of 200 MW. It is expected to come online in July 2027.
- Status
- Planned
- Capacity
- 200 MW
- Location
- Columbia County, Wisconsin
- Developer
- On paid plans
- Expected online
- July 2027
- Balancing authority
- MISO
Location
Columbia County, Wisconsin, outlined on the map